检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:夏华盛 XIA Hua-sheng(Zhejiang Highway&Water Transportation Engineering Consulting Liability Company,Hangzhou 310006,China)
机构地区:[1]浙江公路水运工程咨询有限责任公司,杭州市310006
出 处:《北方交通》2021年第1期62-65,共4页Northern Communications
摘 要:对浙江某山区公路高液限土场地横向陡坡路堤滑坡进行地质地形分析,经方案比选后采用以完善场地排水为主的处治原则,基底以上设清宕渣垫层,地表以下3m内高液限土换填清宕渣,换填层底部设网状渗沟,并运用有限元软件对正常工况及暴雨工况分别进行稳定性数值分析,结果表明,在排水系统完善的情况下路堤稳定系数满足规范要求,项目通车后运行良好。This paper analysis the conditions of a transverse steep embankment slide,a scheme to improve drainage system is adopted based on scheme comparison,permeable embankment filling is constructed on the ground and the high liquid limit soil no deeper than 3m is replaced by permeable embankment filling,a grid shaped underground trench system is set up below the replacement,finite element analysis shows that the safety coefficient of the embankment meets the requirements of the specification as long as the drainage system is in good condition during the normal circumstance and continual heavy rainfall,traffic runs well after the road is opened.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28