检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗绍仟 LUO Shaoqian(Kunming Institute of Survey and Design State Forestry and Grassland Administration,Kunming 650216,China)
机构地区:[1]国家林草局昆明勘察设计院,云南昆明650216
出 处:《昆明冶金高等专科学校学报》2020年第5期91-94,共4页Journal of Kunming Metallurgy College
摘 要:当前公路设计中基于CAD的公路设计软件如纬地、海地、鸿业、路线大师等,均采用平均面积法计算土石方工程量,而在公路施工建设过程中,局部深沟或突兀山嘴的路段,土石方工程量存在不小的误差。采用三维GIS表面分析模型,对局部路段的土石方工程量进行分析计算,结果证明该方法对公路建设过程中的填挖土石方工程量校核具有指导意义。The current highway design software based on CAD all use average area method to calculate the amount of earthwork,such as Hint Soft,Hard,Hong Ye Road,Route Master,etc.However,in the process of road construction and engineering,part gorge or abrupt spur region,there are many errors in the amount of earthwork and stonework.This article uses a three-dimensional GIS surface analysis model to analyze and calculate the amount of earthwork and stonework for local sections.The result proves that this method has guiding significance for the checking of the filling and excavating earthwork quantity in the process of highway construction.
关 键 词:公路工程 三维GIS 土石方工程量 表面分析 数字高程模型
分 类 号:U412.2[交通运输工程—道路与铁道工程] P208[天文地球—地图制图学与地理信息工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49