2^-2-501综采工作面调斜技术及应用  

2^-2-501 Technique and Application of Adjusting Slope in Fully Mechanized Mining Face

在线阅读下载全文

作  者:赵俊杰 Zhao Junjie(Sanjiaohe Coal Mine,Shanxi Fenhe Coking Coal Co.,Ltd.,Shanxi Hongdong 041600)

机构地区:[1]山西汾河焦煤股份有限公司三交河煤矿,山西洪洞041600

出  处:《山东煤炭科技》2020年第12期45-47,共3页Shandong Coal Science and Technology

摘  要:为解决综采工作面刮板输送机、支架上窜下滑的问题,以2^-2-501综采工作面为例,采用了调整两巷错差、改变采煤工艺、外力调溜等调斜措施,确保了两巷安全出口,保证工作面正常推进,提高安全生产效率。该措施及工艺对类似条件下综采工作面调斜具有指导、借鉴作用。In order to solve the problem of scraper conveyor and support sliding up and down in fully mechanized mining face, taking 2^-2-501 fully mechanized working face as an example, the slope adjustment measures such as adjusting the error of two lanes, changing the mining technology, adjusting the slip by external force were adopted to ensure the safety exit of the two lanes, ensure the normal advance of the working face, and improve the safety production efficiency. The measures and technology can be used for reference to the inclined adjustment of fully mechanized working face under similar conditions.

关 键 词:综采 防滑 调斜 

分 类 号:TD823.97[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象