检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫张宁 Yan Zhangning(Sihe Coal Mine of Shanxi Jincheng Anthracite Mining Group Co.,Ltd.,Shanxi Jincheng 048000)
机构地区:[1]山西晋城无烟煤矿业集团有限责任公司寺河煤矿连采一队,山西晋城048000
出 处:《山东煤炭科技》2020年第12期80-82,共3页Shandong Coal Science and Technology
摘 要:针对寺河矿东四盘区西翼回风巷变形严重、控制困难等问题,采用现场调研与工程实践相结合的手段,提出动压影响下盘区巷道无机材料预注浆加固+高预紧力锚索二次补强耦合加固措施,两者构成主动支护系统。现场矿压监测结果表明:联合加固措施有效控制了受动压影响巷道的长期持续变形,彻底改变了反复巷修的被动局面。In view of the serious deformation and difficult control of the return air roadway in the West Wing of Sihe Coal Mine, the coupling reinforcement measures of inorganic material pre grouting and high pre tightening force anchor cable secondary reinforcement under the influence of dynamic pressure are proposed by means of field investigation and engineering practice, which constitute the active support system. The monitoring results show that the combined reinforcement measures can effectively control the long-term continuous deformation of roadway affected by dynamic pressure, and completely change the passive situation of repeated roadway repair.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.133.121