主立井提升系统能力改造方案研究及应用  被引量:4

Research and Application of Capacity Transformation Scheme for Main Shaft Hoisting System

在线阅读下载全文

作  者:孙启迪 Sun Qidi(Fuxing Group Co.,Ltd.,Shandong Zaozhuang 277300)

机构地区:[1]福兴集团有限公司福兴煤矿,山东枣庄277300

出  处:《山东煤炭科技》2020年第12期137-139,共3页Shandong Coal Science and Technology

摘  要:福兴煤矿主井原提升容器为JG-3型箕斗,提升能力为39万t/a。为了将提升能力达到60万t/a,在充分利用现有装备设施的情况下,对提升装置重新校核,更换电机、箕斗和增加部分电控装置。经改造,系统能够安全可靠运行,最大限度地节约改造成本和工期,达到了预期目的。The original lifting container of Fuxing Coal Mine main shaft is JG-3 skip with lifting capacity of 300,000 tons/year. In order to achieve the lifting capacity of 600000 t/a, under the condition of making full use of the existing equipment and facilities, the lifting device is rechecked, the motor and skip are replaced and some electric control devices are added. After the transformation, the system can run safely and reliably, save the cost and construction period to the maximum extent, and achieve the expected purpose.

关 键 词:主井 提升系统 改造 

分 类 号:TD63+3[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象