中都河流域“8·16”山洪致灾机理分析  被引量:13

Analysis on the Disaster Mechanism of “8·16” Flash Flood in Zhongdu River Basin

在线阅读下载全文

作  者:孙桐 杨坡 许泽星 王以逵 王协康[1] SUN Tong;YANG Po;XU Zexing;WANG Yikui;WANG Xiekang(State Key Lab.of Hydraulics and Mountain River Eng.,Sichuan Univ.,Chengdu 610065,China)

机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065

出  处:《工程科学与技术》2021年第1期132-138,共7页Advanced Engineering Sciences

基  金:国家重点研发计划项目(2017YFC1502504);国家自然科学基金重点项目(51639007);四川省科技计划项目(2019YJ0145)。

摘  要:中国西南地区地形地貌条件复杂,极端暴雨山洪灾害频发,显著制约地区社会经济发展。为科学认识暴雨山洪形成过程,揭示受灾地区致灾机制,构建符合区域特征的山洪灾害预警体系,以四川省屏山县中都河流域“8·16”山洪灾害为例,结合实地调查及基础资料,从地区降雨特性、洪水陡涨过程及人类活动3方面入手,系统分析了此次暴雨山洪的灾变响应过程,以及采用水位流量反推法和洪水水位陡涨率判定法计算山洪灾害预警指标阈值。结果表明:此次山洪灾害成因主要在于上游马边县地区短时强降雨导致下游屏山县中都镇河水陡涨,极大缩短了沿河居民转移时间;当地居民围滩造地侵占河道,减少了行洪面积,属于典型的地区强降雨与人类活动综合影响下的突发性暴雨山洪灾害;对比两种预警方法的结果,发现水位流量反推法预警精度稍差且多次出现漏警,洪水水位陡涨率法预警期显著延长,预警效果更为可靠。因此,建议中都河流域山洪灾害防御采用洪水水位陡涨率法和传统预警相结合,以流域划分模式构建马边屏山两县行政联合的山洪预警体系,可为该区域乃至其他类似山洪灾害频发地区的防治提供科学依据。The complicated topographical conditions and rainstorms frequently lead to mountain flash flood disasters,which severely restrict the social and economic development in southwest China.It is very important to scientifically understand the process of flash flood,reveal the disaster mechanism,and construct the early warning system of flash flood considering the regional characteristics.Based on the field investigation and analysis of“8·16”flash flood disaster occurred in the zhongdu River basin.Pingshan County,Sichuan Province,this study systematically analyzed the catastrophic response of flash flood from three aspects of regional rainfall characteristics,flood steeply rising phases and human activities.This study took two methods including a water level discharge relationship and rising of flood level into account early warning values,respectively.The results showed that the heavy rainfall from the upstream Mabian County resulted in this flood disaster event,and the rising of flood level greatly shortened the transfer time duration of residents along the zhongdu riverbank.On the other hand,residents made cultivated land through floodplain,which reduced the flood discharge capacity and increased the disaster risk.It belongs to a typical sudden flash flood disaster under the comprehensive interactions among regional heavy rainfall,topographical conditions and human activities.In short,the traditional earlywarning method of inversions on water level/flow missed several alarms in selected sections,and has slightly poor accuracy.However,the water level rising rate early-warning method is a more reliable from the escape time.That is to say,it is useful to adopt the coupling methods such as rising of flood level and traditional ways in the basin to establish a Mabian County-to-Pingshan County joint flash flood early-warning system.

关 键 词:山洪灾害 致灾机理 洪水水位陡涨率 临界雨量 预警体系 

分 类 号:TV122.1[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象