检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴腾飞 王世明 李豪 林刚[2] 宋同伟[2] Wu Tengfei;Wang Shiming;Li Hao;Lin Gang;Song Tongwei(Faculty of Geosciences and Environmental Engineering,Southwest Jiaotong University,Chengdu 611756,P.R.China;China Railway Eryuan Engineering Group Co.,Ltd.,Underground Railway Design and Research Institute,Chengdu 610031,P.R.China)
机构地区:[1]西南交通大学地球科学与环境工程学院,成都611756 [2]中铁二院工程集团有限责任公司地下铁道设计研究院,成都610031
出 处:《地下空间与工程学报》2020年第6期1746-1753,1791,共9页Chinese Journal of Underground Space and Engineering
基 金:国家自然科学基金(41202042);中央高校基本科研业务费专项资金(2682015CX013)。
摘 要:为解决成都市在高富水砂卵石层中施工引起的地面迟滞沉降等城市工程地质问题,研究成都市砂卵石分布规律,笔者依托已有的成都地铁1、2、3、4、7号线等大量的勘察及区域地质资料,借助Surfer及GOCAD软件,首次建立了成都市中心城区砂卵石层的三维地质模型。三维模型的准确度及精度经过了探井等实测资料的验证,成都中心城区砂卵石层整体厚度由西北向东南逐渐减薄,稍密卵石土层变化平缓,中密卵石土层由北向南沿河流走向变薄特征明显,密实卵石土层底界与基岩接触面深度自西向东逐渐变浅,中心城区卵石土的总体积超过1.7576×10^8m^3。构建的三维地质模型,可为成都市中心城区今后的工程建设提供重要参考。In order to solve various problems of urban engineering geology such as ground hysteresis settlement caused by high water-rich pebble soil layer in the city of Chengdu,and to study the distribution law and overall volume of sand and pebble in Chengdu,a three-dimensional geological model of sand and pebble strata in the central city of Chengdu was established for the first time with the help of Surfer and GOCAD software based on a large number of survey and regional geological data of Chengdu Metro Lines 1,2,3,4 and 7.The accuracy and precision of the 3 D model have been verified by the actual data such as exploration wells.The conclusion shows the overall thickness of the sand pebble soil layer shows gradually thinned from northwest to southeast,the slightly compactness pebble soil layer changes gently,and the middle compactness pebble soil layer gradually thins from north to south along the river.The depth of the boundary between the bottom boundary of the dense pebble soil and the bedrock gradually becomes shallower from west to east,and the total volume of the pebble soil in the central city exceeds 1.7576×10^8m^3.The constructed 3 D geological model can provide an important reference for the future construction of the downtown area of Chengdu.
关 键 词:高富水砂卵石层 钻孔数据 城市工程地质 三维地质建模 GOCAD
分 类 号:P642.4[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.195.167