检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李享[1] 王海龙[1] 张冠男 贾宇[1] 刘艳磊 LI Xiang;WANG Hailong;ZHANG Guannan;JIA Yu;LIU Yanlei(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200135,China)
机构地区:[1]中国建筑第八工程局有限公司,上海200135
出 处:《施工技术》2020年第22期64-66,共3页Construction Technology
摘 要:大型项目机电深化设计过程中管线与门存在软碰撞问题,以天津平安泰达金融中心项目为例,利用非常规BIM门族解决此类问题。首先在BIM软件中提取常规BIM门族,其次在常规BIM门族基础上制作非常规BIM门族并加载到建筑模型,最后进行碰撞检测。结果显示,该方法可有效检测出所有机电管线与门的软碰撞问题。There is a soft collision problem between pipelines and doors in the electromechanical detailed design process of large-scale projects.Taking Tianjin Ping’an TEDA Financial Center project as an example,using unconventional door family of BIM solves such problems.Firstly, extracting the conventional BIM door family from the BIM software,and then the unconventional BIM door family is made on the basis of the conventional BIM door family and loaded into the building model,and finally,the collision detection is performed.The results show that this method can effectively detect all soft collision problem between electromechanical pipelines and doors.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49