横浪海况下“蓝鲸”号起重船吊装上部组块运动响应研究  被引量:6

Study on the motion responses of the crane vessel“Lanjing”during topside-lifting operation in beam waves

在线阅读下载全文

作  者:骆寒冰[1,2] 刘福升 罗晓 谢芃 LUO Han-bing;LIU Fu-sheng;LUO Xiao;XIE Peng(State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China;Department of Naval Architecture and Ocean Engineering,Tianjin University,Tianjin 300072,China)

机构地区:[1]天津大学水利工程仿真与安全国家重点实验室,天津300072 [2]天津大学船舶与海洋工程系,天津300072

出  处:《船舶力学》2021年第1期43-51,共9页Journal of Ship Mechanics

基  金:国家科技重大专项资助项目(2011ZX05027-005)。

摘  要:"蓝鲸"号起重船舶在海上吊装大型上部组块施工过程中,有时受现场条件限制,会出现横浪吊装作业工况,此时组块运动容易偏大,威胁作业的安全,甚至造成设备损坏和人员伤亡事故。本文针对横浪-系泊系统-起重船-吊缆-上部组块复杂耦合系统,开展了数值模拟研究工作,分析吊装组块的运动响应规律和特性。将规则波中运动响应预报结果与水池模型试验结果进行了对比分析,验证了数值模拟的合理性及其精确性,揭示了起重船和吊物的耦合运动机理。针对典型横浪不规则波工况,开展了运动响应预报,并和Noble Denton相关衡准进行了对比,给出了允许施工作业工况的建议。Lifting a topside with a floating crane vessel in beam waves is sometimes necessary due to the limitation of offshore field layout.In this case,the motions of the topside are probably large,which will threaten the safety of lift operations.Numerical simulations are carried out for the complex coupling system,including the beam waves,the mooring system,the crane vessel"Lanjing",the crane sling and the topside.The coupled motions are predicted in regular waves,the results of which are compared correspondently with experimental ones.Fairly good agreements are reached.The resonance phenomena are clearly observed and the physical mechanism is revealed.The topside motions are simulated in some typical irregular waves in beam seas.Statistical results are compared with the threshold values suggested by Noble Denton Guideline.Recommendations are made for the selection of the sea state for the safety of lifting operations.

关 键 词:起重船 吊装组块 数值模拟 横浪 耦合运动 

分 类 号:U661[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象