丽江古城区金足水库溢洪道水力设计  

Hydraulic Design of Jinzu Reservoir Spillway in Lijiang Ancient City

在线阅读下载全文

作  者:刘玲玲 腾英超 LIU Ling-ling;TENG Ying-chao(PowerChina Kunming Engineering Corporation Limited,Kunming 650051,China)

机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051

出  处:《云南水力发电》2021年第1期108-112,共5页Yunnan Water Power

摘  要:中小型水库工程中,一般不专门开展水工模型实验。溢洪道的水力设计主要依赖于水力学计算,故水力计算的清晰、严谨至关重要。结合金足水库溢洪道工程,阐明、梳理了溢洪道水力设计的要点及计算方法,确保溢洪道具有良好的水力体型。In small and medium-sized reservoir engineering,hydraulic model experiment is not specially carried out.The hydraulic design of spillway mainly depends on hydraulic calculation,so the clarity and preciseness of hydraulic calculation are very important.Combined with the spillway project of Jinzu reservoir,this paper expounds the main points and calculation methods of the spillway hydraulic design,so as to ensure that the spillway props have good hydraulic shape.

关 键 词:溢洪道 水力设计 控制水深 水面线 底坡连接抛物线 侧收缩角 挑坎 

分 类 号:TV135[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象