火力发电厂循环冷却水处理系统的优化选择  被引量:3

Optimal Selection of Circulating Cooling Water Treatment System for Fossil Fuel Power Plant

在线阅读下载全文

作  者:丁业 吕战圣 苏敏 DING Ye;LV Zhan-sheng;SU Min(Henan Electric Power Survey and Design Institute,Henan Zhengzhou 450007;SPIC Henan Electric Power Co.,Ltd.,Qinyang Power Generation Branch,Henan Jiaozuo 454550,China)

机构地区:[1]河南省电力勘测设计院,河南郑州450007 [2]国家电投河南电力有限公司沁阳发电分公司,河南焦作454550

出  处:《广州化工》2021年第2期103-106,共4页GuangZhou Chemical Industry

摘  要:某火力发电厂超超临界机组主水源为城市再生水,不足和备用水源为水库水,针对城市再生水和水库水的水质特点、以及循环冷却水工况及水质要求,综合全厂水量平衡,经过循环水处理系统多方案的技术经济比较。结果表明:循环冷却水采用补充水石灰软化处理和循环水旁流石灰软化处理的方案具有运行安全可靠、投资省和运行费用低等优点,可保证循环水处理系统的安全经济运行。The main water source of ultra supercritical unit in a fossil fuel power plant is urban reclaimed water,and the insufficient and standby water source is reservoir water.According to the water quality characteristics of urban reclaimed water and reservoir water,as well as circulating cooling water conditions and water quality requirements,compared the water balance of the whole plant,the technical and economic comparison of several schemes of circulating water treatment system was discussed.The results indicated that the scheme of lime softening treatment for make-up water and side-stream lime softening treatment for circulating water had the advantages of safe and reliable operation,low investment and low operating cost,which can ensure the safe and economic operation of circulating water treatment system.

关 键 词:火力发电厂 循环水处理 城市再生水 石灰处理 

分 类 号:TM621.8[电气工程—电力系统及自动化]

 