检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张进 Zhang Jin(Guangdong Hydropower Planning&Design Institute Co.,Ltd,Guangzhou 510635,China)
机构地区:[1]广东省水利电力勘测设计研究院有限公司,广东广州510635
出 处:《广东水利水电》2021年第1期88-92,共5页Guangdong Water Resources and Hydropower
摘 要:为适应工程截流条件的复杂多样性,以立堵截流水力学的计算原理为依据,引入初始边界条件Hc——截流初始分流建筑物进口的水深,将落差比Z/Z max修正为(Z+H c)/(Z max+H c)、分流公式Q f=(Z/Z max)nQ 0修正为Q f=(Z+H c)/(Z max+H c)nQ 0,扩大了截流水力学计算的应用范围,并编制了电算程序。经多宗工程的截流设计实践,计算成果合理可靠。In order to adapt to the complexity and diversity of engineering closure conditions,this paper starts from the calculation principle of vertical closure hydraulics,introduces the initial boundary condition H c——the water depth at the entrance of the initial diversion building for closure.The drop ratio Z/Zmax is modified into(Z+H c)/(Z max+H c)and diversion formula is modified into.As a result,the application scope of hydraulic closure calculation is expanded,and the computer program is worked out.The calculation results are proved to be reasonable and reliable through closure design practices of many projects.
分 类 号:TV551.21[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.230