检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚军 YAO Jun(Guoneng Shuohuang Railway Development Co.,Ltd.,062350,Su'ning,Hebei,China)
机构地区:[1]国能朔黄铁路发展有限责任公司,河北肃宁062350
出 处:《建筑技术》2021年第1期81-83,共3页Architecture Technology
摘 要:黄骅南站站区综合整治工程职工宿舍基坑施工中,针对地下水位高和不同的周边环境,采用长螺旋钻孔压灌桩+预应力锚索和自然放坡+土钉墙2种支护形式。采用降低坑外止水+坑内疏排方案降低地下水水位,使用素混凝土回填解决了抗浮问题,确保了基坑安全。During the construction of the foundation pit of the staff dorm itory of H uanghua South Station Comprehensive Renovation Project,according to the high groundwater level and different surrounding environm ents,two types of support are adopted:long spiral bored cast-in-place pile+prestressed anchor cable and natural grading+soil nail wall form.The scheme of reducing water stop outside the pit+draining inside the pit is adopted to reduce the groundwater level,and plain concrete backfilling solves the anti-floating problem and ensures the safety of the foundation pit.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117