检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡兢 Hu Jing(Malan Mine,Xishan Coal and Electricity Group Corporation Ltd.,Taiyuan 030053,China)
机构地区:[1]西山煤电集团有限责任公司马兰矿,山西太原030053
出 处:《煤炭与化工》2020年第12期58-60,共3页Coal and Chemical Industry
摘 要:以福昌煤矿实际地质材料为背景,基于10 a水位统计以及突水系数,将回采区域划分为安全区域、威胁区域和突水危险区域。安全区域、威胁区域无需进行人工预防便可正常回采,但对于突水危险区域,则需采用下止浆塞的注浆方法对底板薄弱段进行注浆加固,工程应用效果显示,对突水区域进行注浆加固,工作面回采过程中无奥灰水渗出,注浆工艺效果显著。Fuchang Mine actual geological materials were taken as the background,based on 10 years level statistics as well as the water inrush coefficient,the mining area was divided into safety area,threatened area and water inrush danger zone,among them,the safety area,threatened area without artificial prevention can adopted by normal recovery mining,the water inrush danger zone,with the check of slurry grouting method was adopted to bottom weak section of grouting reinforcement,engineering application results showed that the water bursting area of grouting reinforcement,in the process of the Ordovician Limestone water seepage,proved the success of the grouting process.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7