检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐全 吴家耀[1,2] 褚卫江 XU Quan;WU Jiayao;CHU Weijiang(Power China Huadong Survey and Design Institute Co.,Ltd.,Hangzhou 311122,P.R.China;HydroChina ITASCA Research and Development Center,Hangzhou 310000,P.R.China)
机构地区:[1]中国电建建团华东勘测设计研究院有限公司,杭州311122 [2]浙江中科依泰斯卡岩石工程研发有限公司,杭州310000
出 处:《重庆大学学报》2021年第1期119-130,共12页Journal of Chongqing University
基 金:国家自然科学基金重大研究计划重点支持项目(51679215)。
摘 要:大跨度洞室的最小矢跨比是大跨度洞室尺寸设计的重要参考依据,基于能够考虑岩体软化、剪胀、体胀、密度变化等开挖响应特征的Cavehoek本构模型和能够反映不同岩体质量、岩石单轴抗压强度条件下的极限应变标准,对不同地质强度指标GSI、埋深、侧压力系数、结构面等条件下的60 m大跨度洞室的最小矢跨比进行了研究。结果表明,GSI、侧压力系数、埋深3个因素中,GSI对大跨度洞室的最小矢跨比影响最大,侧压力系数和埋深次之;岩体质量越好,最小矢跨比越小,最小矢跨比与侧压力系数和埋深之间并非线性关系。结构面和岩石单轴抗压强度对大跨度洞室最小矢跨比有较大的影响,尤其是缓倾结构面非常不利于大跨度洞室成拱。The smallest rise-span ratio of large span cavern is an important reference to design the dimension of large span cavern.Based on both cavehoek constitutive model which can take some response characteristics during the excavation into consideration,such as the softening behavior of rock mass,dilation,volume expansion,density change,etc.,and the critical strain which can reflect the influence of rock mass quality and UCS of the intact rock,the smallest rise-span ratio of 60 m long span caverns with different values of GSI,buried depth,lateral pressure coefficient of in-situ stress,structural planes,etc.were studied.The results show that:among the three factors of GSI value,lateral pressure coefficient and burial depth,the value of GSI has the biggest influence on the smallest rise-span ratio of large-span cavern,followed by the lateral pressure coefficient and burial depth.The better the rock mass,the smaller the ratio of smallest rise-span,and the minimum rise-span ratio is not linear with the lateral pressure coefficient and burial depth.The structure plane and UCS of intack rock also has great influence on the minimum rise-span ratio of large span cavern,especially the gently inclined structural plane which is not conducible to the arch forming of large-span caverns.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90