检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈刚[1] 袁道和 CHEN Gang;YUAN Daohe(Beijing Research Institute of Chemical Engineering and Metallurgy,CNNC,Beijing 101149,China;Shaoguan Jinyuan Uranium Co.,Ltd.,CNNC,Shaoguan 512329,China)
机构地区:[1]核工业北京化工冶金研究院,北京101149 [2]中核韶关锦原铀业有限公司,广东韶关512329
出 处:《铀矿冶》2021年第1期65-69,共5页Uranium Mining and Metallurgy
摘 要:某铀矿井开采深度的增加和采矿方法的改变,给采场顶板稳定性带来了新的不确定因素。为了及时掌握深部采矿中,采用不同采矿方法时采场顶板围岩的稳定性,在-150m中段12-4采场布置钻孔应力计、压力计和位移计,分别对巷道围岩和采场顶板的表面位移、顶板压力和应力进行监测。通过对比分析监测数据,掌握了上向矸石充填法和无轨采矿法采场顶板稳定性的变化情况,为矿山的安全生产提供了科学指导。With the increase of mining depth and stress of surrounding rock in a uranium mine,the roof ground pressure activities are frequent,and the probability of accidents such as roof fall and side slope deviation is increasing.At the same time,the change of mining method also brings new uncertain factors to the stability of stope roof.In order to grasp the stability of the surrounding rock of the stope roof under different mining methods in the deep mining in time,borehole stress gauge,pressure gauge and displacement gauge are arranged in the 12-4 stope in the middle section of-150 m to monitor the surface displacement,roof pressure and stress of the surrounding rock of the roadway and the roof of the stope.Through collecting and sorting out the monitoring data,the roof stability changes of the stope with upward gangue filling method and trackless mining method are compared and analyzed,so as to provide scientific guidance for the safe production of the mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.218.204