检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海洋 Wang Haiyang(不详)
机构地区:[1]辽宁石佛寺供水有限责任公司,辽宁沈阳110166
出 处:《吉林水利》2021年第2期40-42,54,共4页Jilin Water Resources
摘 要:预应力闸墩锚固竖井部位的受力情况比较复杂,其体型和参数优化设计具有十分重要的价值和作用。文章以葠窝水库除险加固工程为例,利用数值模拟的方法进行了闸墩锚固竖井体型优化研究。结果表明采用弧形锚固竖井设计具有重要的工程价值,而弧形的圆心角为90°时锚固竖井受力效果最佳,应为设计推荐方案。As the force condition of anchoring shaft for pre-stressed pier is complex,the optimization design of its shape and parameters plays a significant role.Taking the reinforcement project of Shenwo Reservoir as an example,the shape optimization of anchoring shaft for sluice pier is studied by using numerical simulation method.It is considered that the design of arc-shaped anchoring shaft has important engineering value,of which the stress effect of anchored shaft is the best when the arc center angle is 90°,and it should be the recommended design scheme.
分 类 号:TV652.1[水利工程—水利水电工程] TV662.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.164.14