检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白俊岭[1] 李岳东[1] 武帅[1] Bai Junling;Li Yuedong;Wu Shuai(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《水利水电工程设计》2020年第4期11-14,56,共5页Design of Water Resources & Hydroelectric Engineering
摘 要:超大直径调压井的开挖及围岩稳定直接影响调压井整体结构稳定和工程量,是关系调压井及发电引水系统安全性、工期和工程投资的关键问题。结合新疆某工程超大直径调压井,总结国内外超大直径调压井的开挖支护措施,根据本工程初拟的调压井开挖及一次支护措施,对调压井围岩进行整体稳定性计算,确定其支护参数的可靠性。超大直径调压井一次支护措施及围岩稳定计算方法可为今后超大直径调压井开挖支护措施选择提供参考。The excavation of super large diameter surge shaft and stability of surrounding rock have direct impact on the overall structural stability and quantities of surge shaft,this is a key issue related to the safety,construction period and investment of surge shaft and water diversion system.In combination with a super large diameter surge shaft in Xinjiang,this paper summarizes the excavation and support measures of super large diameter surge shaft at home and abroad.The overall stability of surrounding rock of surge shaft is calculated according to the proposed excavation and primary support measures to determine the reliability of support parameters.The primary support measures and rock stability calculation method provide a reference for the selection of excavation and support measures for super large diameter surge shaft in the future.
分 类 号:P62[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222