检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐建闽[1] Xu Jianmin(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《水利水电工程设计》2020年第4期40-42,56,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:结合新疆某高拱坝项目前期地勘工作的经验和教训,总结、归纳了超高拱坝前期地勘工作布置,尤其是平洞布置与岩体试验工作安排需注重的要点,对坝基岩体质量分级、大坝建基面选择、坝基(肩)抗滑稳定分析、坝基防渗控制、边坡稳定分析等高拱坝主要工程地质问题的分析、论证,提出了分析研究的重点方向和基本思路。Combined with the experience and lessons of geological survey in the early stage of a high arch dam project in Xinjiang,this papersummarizes the key points of geological survey arrangement especially the layout of adit and rock mass test in the early stage of superhigharch dam. It put forward the emphasis and basic ideas in analysis and demonstration of the main geological problems of high archdam,such as quality classification of dam foundation rock mass,selection of dam foundation face,anti-sliding stability of damfoundation(abutment),seepage control of dam foundation,slope stability,etc.
关 键 词:平洞开挖 岩体试验 岩体质量分级 抗滑稳定 边坡稳定 防渗控制
分 类 号:TV221[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171