作 者:宋德林 陈飞宇 郑文翔 孙明 阚景文 SONG Delin;CHEN Feiyu;ZHENG Wenxiang;SUN Ming;KAN Jingwen(Institute of Mining and Coal,Inner Mongolia University of Science&Technology,Baotou 014010,China;Mining Research Institute,Inner Mongolia University of Science&Technology,Baotou 014010,China;Xishimen Iron Mine,China Minmetals Corporation Hanxing Mining Co.,Ltd.,Handan 056303,China)
机构地区:[1]内蒙古科技大学矿业与煤炭学院,内蒙古包头014010 [2]内蒙古科技大学矿业研究院,内蒙古包头014010 [3]五矿邯邢矿业有限公司西石门铁矿,河北邯郸056303
出 处:《中国矿业》2021年第2期114-120,共7页China Mining Magazine
基 金:内蒙古自治区自然科学基金项目资助(编号:2019MS05042);内蒙古科技大学创新基金项目资助(编号:2019QDL-B27)。
摘 要:为了解决西石门铁矿北区矽卡岩和完整性较好的矿石部位巷道使用拱架支护成本高、效果不理想的问题,设计采用锚网喷技术对巷道进行支护。为了得到理想的支护效果,需要对支护参数进行分析与研究,首先进行了点荷载实验以及结构面的调查,并在此基础上利用广义Hoek-Brown强度准则对岩块物理力学参数进行了工程折减处理,以此得到矿体和矽卡岩的岩体力学参数;随后,根据Q系统岩体分类方法计算了矿体以及矽卡岩的Q值,并据此选取了支护参数、制定了施工方案;最后,根据设计的支护方案对巷道支护效果进行了数值模拟验证,并应用于实践当中。结果表明:未受采动压力作用的矽卡岩和矿石部位,使用2.4 m长的锚杆进行锚网喷支护可以满足稳定性的要求,在此前提下,可以节省巷道支护成本1800元/m。In order to solve the problems of high cost and unsatisfactory performance of arch support in the roadway of skarn and better integrity ore parts in the northern area of Xishimen iron mine,anchor net spraying technology is adopted to support the roadway.In order to obtain the ideal support effect,the support parameters need to be studied.Firstly,point load and structural plane surveys were performed.Based on this,the generalized Hoek-Brown strength criterion was used to reduce the physical and mechanical parameters of the rock blocks to obtain the mechanical parameters of the ore body and skarn.Secondly,the Q values of the ore body and skarn were calculated according to the Q system rock mass classification method,and the supporting parameters were selected and the construction scheme is formulated.Finally,numerical simulation verification of the support effect of the roadway is carried out according to the design scheme,and it is applied in practice.The results show that:for skarn and ore parts that are not subjected to mining pressure,the use of 2.4 m long anchor rods for bolt-net-spray support can meet the requirements of stability.Under this premise,1800 yuan can be saved in the support cost of per meter roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13