检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏飞 LI Peng-fei(CCCC-SHEC Third Highway Engineering Co.,Ltd.,Xi'an 710016,China)
机构地区:[1]中交二公局第三工程有限公司,西安710016
出 处:《价值工程》2020年第36期151-152,共2页Value Engineering
摘 要:在公路桥梁工程施工中,传统的桥梁墩柱现浇施工技术已经落伍,其中存在大量的问题,不仅延长了工程的施工工期,也降低了工程施工的质量,并带来了大量的工程隐患。而装配式桥梁墩柱预制技术的应用,则彻底改变了这一现状,极大地缩短了施工工期,提升了工程施工质量。In the construction of highway bridge engineering,the traditional cast-in-place construction technology of bridge piers has fallen out of date.There are a lot of problems in it,which not only prolongs the construction period of the project,but also reduces the quality of the construction,and brings a lot of hidden dangers.The application of prefabricated bridge pier column technology has completely changed this status quo,greatly shortened the construction period and improved the construction quality of the project.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229