检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴佐伟 Wu Zuowei(Zhaozhuang Coal Mine,Jincheng Coal Industry Group,Shanxi Jincheng 048000)
机构地区:[1]山西晋煤集团赵庄煤业连掘三队,山西晋城048000
出 处:《山东煤炭科技》2021年第1期10-12,15,共4页Shandong Coal Science and Technology
摘 要:针对33072巷厚伪顶区容易产生的冒顶问题,根据工程特性制定了"掘进前预注+滞后注浆锚索"方案。掘进前预注采取浅孔循环注浆方式,高粘结性的马丽散注浆材料;滞后注浆锚索采用速凝早强、低成本的耐固注浆材料(双液)。效果考察表明:注浆后掘进未发生冒顶现象,5个月后进行顶板钻孔窥视,未发现新的离层。Aiming at the problem of roof fall in thick false roof area of 33072 roadway,an implementation plan of "pre-drilling before digging + lagging grouting anchor cable" was formulated according to engineering characteristics.Before driving,shallow hole circulating grouting method is adopted for pre grouting,and high cohesive Malisan grouting material is used;the lag grouting anchor cable adopts fast setting,early strength and low cost solid resistant grouting material (double liquid).The results show that there is no roof fall phenomenon in the excavation after grouting,and no new separation layer was found after drilling in the roof five months later.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.242.110