检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘权 杨跃斌 龙方 肖忠礼 闵元科 牟冲 LIU Quan;YANG Yuebin;LONG Fang;XIAO Zhongli;MIN Yuanke;MOU Chong(Shenzhen Pumped Storage Power Co.,Ltd.,Shenzhen 518115,Guangdong,China)
出 处:《水力发电》2021年第2期14-17,30,共5页Water Power
摘 要:深圳抽水蓄能电站为我国首座在超大型城市内建设的大型抽水蓄能电站,电站周边有高度城市化的区域、旅游景点和饮用水源保护区。针对工程建设中生态环境保护的突出问题,介绍了深圳抽水蓄能电站工程建设过程中,就大型水电工程的生态环境和饮用水源地的保护所采取的一系列措施及做法。实践表明,效果较好,对同类电站提高工程建设环境保护工程质量和效果具有一定参考价值。Shenzhen Pumped-storage Power Station is the first large-scale pumped-storage power station built in a megacity area in China.The station is surrounded by urbanized areas,tourist attractions and drinking water source protection areas.In view to the prominent ecological and environmental protection problems in the construction of the project,a series of measures and practices adopted for the protection of ecological environment and drinking water sources during the construction of Shenzhen Pumped-storage Power Station are introduced.The practice shows that the effects of protection measures are good,which has certain reference value for similar power stations to improve the quality and effect of environmental protection projects in engineering construction.
关 键 词:生态环境 协调发展 工程建设 超大城市 深圳抽水蓄能电站
分 类 号:X321[环境科学与工程—环境工程] TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7