检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:娄泽方 张达生 袁强 温四清 王海 LOU Zefang;ZHANG Dasheng;YUAN Qiang;WEN Siqing;WANG Hai(CITIC General Institute of Architectural Design and Research Co.,Ltd.,Wuhan 430014,China)
机构地区:[1]中信建筑设计研究总院有限公司,武汉430014
出 处:《建筑结构》2021年第1期36-40,93,共6页Building Structure
摘 要:天津中信城市广场首开区地下室平面尺寸为528m×73m,为超长地下结构,采用逆作法施工。桩基方案选型优化确定采用框架柱与临时立柱相结合的"一柱一桩"方案,对逆作结构连接的关键节点进行了分析,考虑了超长结构的温度效应,并采取相应的设计措施。工程监测结果表明,结构沉降均匀稳定,楼板未出现明显的温度裂缝,达到了设计预期。The plan size of the basement in the First Phase Project of Tianjin CITIC City Plaza is 528 m×73 m. It is an ultra-long basement structure and was constructed by top-down construction method. The selection of pile foundation scheme was optimized and determined to adopt the "one column one pile" scheme combining frame columns and temporary columns. The key nodes of the top-down structure connection were analyzed, the temperature effect of the ultra-long structure was considered, and corresponding design measures were taken. The engineering monitoring results show that the structural settlement is uniform and stable, and there are no obvious temperature cracks in the floor, which meet the design expectations.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222