严寒地区高铁隧道全包防水设计  被引量:3

Fully-enclosed Waterproof Design of HSR Tunnel in Severe Cold Regions

在线阅读下载全文

作  者:吴小策 WU Xiaoce(Civil Ergineering Design Research Institute,China Railway Design Corporation,Tianjin 300251,China)

机构地区:[1]中国铁路设计集团有限公司土建工程设计研究院,天津300251

出  处:《中国铁路》2021年第2期27-31,共5页China Railway

基  金:中国铁路设计集团有限公司科技开发课题(2019YY120301)。

摘  要:由于高速铁路列车运行速度较高,对隧道安全使用功能要求也相应提高。严寒地区高铁隧道的渗漏水、挂冰等病害,一直是困扰东北铁路运营部门的难题。防止全包防水型隧道后期渗漏水是目前铁路隧道建设的重点研究内容。介绍哈牡客专爱民隧道全包防水设计系统,并总结分析隧道运营后的实施效果,可为严寒地区高铁隧道的防寒保温及全包防水设计提供参考。Due to the high running speed of HSR trains,the requirements for the safe service of tunnels are correspondingly improved.Water leakage,ice hanging and other diseases of HSR tunnels in the severe cold regions have always been the problems that puzzle railway operation departments in Northeast China.In case of water leakage of the fully-enclosed waterproof tunnel put into operation for a long time,it is difficult to find an effective solution for elimination,which is also the key research subject of railway tunnel construction at present.This paper introduces the fully-enclosed waterproof design system of Aimin Tunnel of Harbin-Mudanjiang Passenger Dedicated Line,and summarizes and analyzes the implementation effect after the tunnel is put into operation,which provides a reference for the cold protection and thermal insulation as well as the fully-enclosed waterproof design of HSR tunnels in severe cold regions.

关 键 词:严寒地区 隧道病害 隧道保温 全包防水 

分 类 号:U457[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象