检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘福营 温学军 PAN Fuying;WEN Xuejun(State Grid Xin Yuan Company Ltd,Beijing 100761,China;Jilin dunhua pumped storage Company.Ltd,Dunhua 133700,China)
机构地区:[1]国网新源控股有限公司,北京市100761 [2]吉林敦化抽水蓄能有限公司,吉林省敦化市133700
出 处:《水电与抽水蓄能》2021年第1期91-93,108,共4页Hydropower and Pumped Storage
摘 要:每座抽水蓄能电站工程包括多条斜(竖)井,施工工艺一般是先开挖导井再从上至下进行扩挖成型,导井开挖有人工法、机械法等多种施工工艺,斜(竖)井施工难度大、安全风险高,本文就导井开挖施工技术进行全面总结概述,各项目可根据工程具体情况综合论证后确定导井施工方法。Each of pumped storage power station project including multiple inclined(vertical)Wells,construction technology is usually first excavation guide well again from top to bottom to enlarge dig molding,guide shaft excavation method,mechanical method such as a variety of construction technology,oblique(vertical)well construction is difficult,high security risks,this paper makes a comprehensive summary guide shaft excavation construction technology overview,the project can be determined after comprehensively according to project specific situation guide well construction method.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188