检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘家会 LIU Jiahui(China Construction Fifth Engineering Bureau Co.,Ltd.Anhui Branch,Hefei,Anhui 230041,China)
机构地区:[1]中国建筑第五工程局有限公司安徽分公司,安徽合肥230041
出 处:《施工技术》2020年第24期31-33,共3页Construction Technology
摘 要:以合肥市公共卫生管理中心项目为工程背景,建立三维参数化BIM模型,对BIM技术在施工中的应用落地进行研究,通过三维场布进行施工现场的动态管理,采用钢结构施工模拟指导复杂节点施工,进行安装深化设计、幕墙施工模拟、高支模设计、精装修深化设计,将BIM技术融入施工阶段的深化设计中,提高施工质量,体现BIM技术在施工过程中的应用价值。The 3 D parametric BIM model is established taking the Hefei Public Health Management Center project as the engineering background. The application of BIM technology in construction is studied the dynamic management of the construction site is performed through the 3 D field distribution,steel structure construction simulation is used to guide construction of complex joints, deepened installation design,curtain wall construction simulation,high support formwork design,and refined decoration deepened design is completed. BIM technology is incorporated into the deepened design of the construction stage,which improves the construction quality and reflects the application of BIM technology in the construction process value.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171