万家口子水电站拱坝基础处理设计  被引量:1

Treatment Design of Arch Dam Foundation of Wanjiakouzi Hydropower Station

在线阅读下载全文

作  者:熊图耀 XIONG Tuyao(China Energy Engineering Group Guangxi Electric Power Design Institute Co,Ltd,Nanning,Guangxi,530007)

机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007

出  处:《红水河》2021年第1期29-34,38,共7页Hongshui River

摘  要:对万家口子碾压混凝土拱坝实际开挖揭露的断层软弱带分布情况进行了系统介绍,提出初步加固方案,通过计算分析其对大坝应力、变形及坝肩稳定等方面的影响,最终拟定安全可靠、经济合理的加固措施。初期蓄水期间的监测成果表明,大坝的应力大小及分布范围、坝肩变形、渗流量等指标均符合规范和设计要求,基础处理加固设计是合理的。The distribution of fault weak zone exposed by the actual excavation of W anjiakouzi RCC arch dam is systematically introduced,and the preliminary reinforcement scheme is proposed.Through calculation and analysis of its influence on dam stress,deformation and stability of dam abutment,the safe,reliable,economic and reasonable reinforcement measures are finally formulated.The monitoring results during the initial impoundment show that the stress value and distribution range of the dam,the deformation of the dam abutment and the seepage flow are in line with the specifications and design requirements,and the foundation treatment and reinforcement design is reasonable.

关 键 词:碾压混凝土拱坝 断层软弱带 坝体应力 坝肩稳定 渗流分析 监测 加固措施 

分 类 号:TV642.42[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象