茅洲河综合整治工程堤防选取及堤基加固处理措施探讨  被引量:5

Discussion on the Selection of Dike and the Reinforcement Measures of Dike Foundation in the Comprehensive Regulation Project of Maozhou River

在线阅读下载全文

作  者:郑贺秋 ZHENG He-qiu(Dongguan Water Affairs Engineering Quality Safety Monitoring Station,Dongguan 523000,Guangdong,China)

机构地区:[1]东莞市水务工程质量安全监督站,广东东莞523000

出  处:《水利科技与经济》2021年第2期88-92,共5页Water Conservancy Science and Technology and Economy

摘  要:茅洲河现状堤防难以满足防洪需求,结合工程实际情况,经过方案比选,选择直立式堤身,使用桩基础,可减少对河道两岸建筑的扰动。经过数值模拟分析,采用桩基础可有效控制堤防变形,效果良好。The current embankment of Maozhou river is difficult to meet the flood control demand.According to the actual situation of the project,through scheme comparison and selection,vertical embankment body is selected and pile foundation is used,which can reduce the disturbance to the buildings on both sides of the river.Through numerical simulation analysis,pile foundation can effectively control the deformation of the embankment with good effect.

关 键 词:河道治理 堤防 混凝土灌注桩 数值模拟 

分 类 号:TV223[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象