检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑贺秋 ZHENG He-qiu(Dongguan Water Affairs Engineering Quality Safety Monitoring Station,Dongguan 523000,Guangdong,China)
机构地区:[1]东莞市水务工程质量安全监督站,广东东莞523000
出 处:《水利科技与经济》2021年第2期88-92,共5页Water Conservancy Science and Technology and Economy
摘 要:茅洲河现状堤防难以满足防洪需求,结合工程实际情况,经过方案比选,选择直立式堤身,使用桩基础,可减少对河道两岸建筑的扰动。经过数值模拟分析,采用桩基础可有效控制堤防变形,效果良好。The current embankment of Maozhou river is difficult to meet the flood control demand.According to the actual situation of the project,through scheme comparison and selection,vertical embankment body is selected and pile foundation is used,which can reduce the disturbance to the buildings on both sides of the river.Through numerical simulation analysis,pile foundation can effectively control the deformation of the embankment with good effect.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.162.245