检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高瑞超[1] 张翠英 张存柱 Gao Ruichao;Zhang Cuiying;Zhang Cunzhu(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China;Tianjin Foreign Studies University,Tianjin 300204,China)
机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222 [2]天津外国语大学,天津300204
出 处:《港工技术》2021年第1期118-120,共3页Port Engineering Technology
摘 要:针对阳江港丰头作业区拟建多用途码头附近水域潮位控制的问题,论证出一套切实可行的验潮站布设方案,对以后的水深测量工作具有指导意义。文中实验结果验证此区域范围内潮汐性质一致,潮位基本相同,后续测量只需布设一个临时验潮站即可满足此区域内水深测量精度要求。A set of feasible layout strategies of tide station is analyzed and studied in order to effectively control the tide level around the proposed multi-purpose terminal in Fengtou operation zone of Yangjiang Port,the research results have guiding significance for the bathymetric survey in future.The experimental results show same tidal properties and basically same tide level.Only a temporary tide station is required for subsequent survey to meet the requirements of bathymetric survey accuracy.
分 类 号:U656.6[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7