检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钮红亮 钮红喜 Niu Hongliang;Niu Hongxi(Datong Coal Mine Group Safety Management Supervision Bureau,Shanxi Datong 037003;Datong Coal Mine Group Linfen Hongda Company Wanjie Coal Industry,Shanxi Linfen 041000)
机构地区:[1]大同煤矿集团安全管理监察局,山西大同037003 [2]大同煤矿集团临汾宏大公司万杰煤业,山西临汾041000
出 处:《山东煤炭科技》2021年第2期154-156,160,共4页Shandong Coal Science and Technology
摘 要:针对同忻矿8102双侧小煤柱孤岛综放工作面在回采过程中存在的强压力显现的问题,通过采取卸压钻孔、起底、开卸压槽、补强永久支护、加强超前支护等措施,实现了压力卸载与释放,加强了工作面的支护强度,有效避免了工作面发生强矿压灾害。In view of the problems of strong pressure in the mining process of the 8102 small coal pillar isolated island fully mechanized caving face in Tongxin Mine,the pressure unloading and release are realized by taking measures such as pressure relief drilling,bottom lifting,opening and unloading groove,reinforcing permanent support and strengthening advance support,strengthening the support strength of the working face and effectively avoiding the strong mining pressure disaster in the working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7