烧结烟气超低排放条件下烟囱高度合理性探讨  

Discussion on Rationality of Chimney Height under Ultra-low Emission of Sintering Flue Gas

在线阅读下载全文

作  者:荣宜 闫小燕[1] 张奇[1] 王飞[1] RONG Yi;YAN Xiaoyan;ZHANG Qi;WANG Fei(Northern Engineering and Technology Corporation,MCC,Dalian 116600,China)

机构地区:[1]中冶北方工程技术有限公司,辽宁大连116600

出  处:《矿业工程》2021年第1期52-54,59,共4页Mining Engineering

摘  要:系统介绍了烧结主烟囱高度需考虑的因素,针对300 m^(2)烧结机进行烟囱抽力计算、污染物最大落地浓度预测分析。经计算,对于300 m^(2)烧结机,烟囱高度为74 m时可满足其排烟要求;对不同组合下污染物最大落地浓度对比分析,300 m^(2)烧结机主烟囱高度H≥80 m时,通过提高烟囱高度降低污染物落地浓度的降幅不明显,且烟囱高度越高,降幅越小。This paper systematically introduces the factors that need to be considered in the height of the main chimney of the sintering plant,calculates the chimney draught and predicts and analyzes the maximum ground-level concentration of pollutants for a 300 m^(2) sintering machine.After calculation,for 300 m^(2) sintering machine,the chimney height of 74 m can meet the requirements of flue gas exhausting.Comparing and analyzing the maximum ground-level concentration of pollutants under different combinations,when the height(H)of the main chimney of 300 m^(2) sintering machine is≥80 m,the decrease of the ground-level concentration of pollutants by increasing the chimney height is not obvious,and the higher the chimney height,the smaller the decrease.

关 键 词:烧结烟气 烟囱高度 烟囱抽力 污染物最大落地浓度 

分 类 号:TF124[冶金工程—粉末冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象