综采工作面过陷落柱安全技术研究  被引量:11

Study on safety technology of fully mechanized mining face passing through collapse column

在线阅读下载全文

作  者:鲁蒙[1] 舒梅 周横全 LU Meng;SHU Mei;ZHOU Hengquan(不详)

机构地区:[1]煤炭工业石家庄设计研究院贵州分院,贵州贵阳550001

出  处:《中国矿山工程》2021年第1期42-43,51,共3页China Mine Engineering

摘  要:本文对1606综采工作面过X3陷落柱时煤体、顶板岩层破碎,提出以注浆加固、布置撞锲的顶板管理措施,并详细对布置技术方案进行阐述。现场应用时,将工作面回采速度由3.2m/d提升至4.5m/d,避免顶板来压。通过注浆、撞锲支护后工作面煤壁、顶板均保持稳定,工作面耗时10d通过陷落柱,取得了显著应用成果。In this paper,when 1606 fully mechanized coal mining face passes through X3collapse pillar,the coal and roof strata are broken,the roof management measures of grouting reinforcement and arrangement of bumping wedge are put forward,the layout technical scheme is described in detail.In field application,the mining speed of working face is increased from 3.2m/d to 4.5m/d,avoid roof pressure.After grouting and wedge support,the coal wall and roof of the working face remain stable,the working face took10 days to pass through the collapse column,and achieved remarkable application results.

关 键 词:回采工作面 陷落柱 地质构造 注浆加固 顶板管理 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象