检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈质毅 CHEN Zhi-yi(China Construction Second Engineering Bureau Ltd.,200135,Shanghai,China)
机构地区:[1]中国建筑第二工程局有限公司,上海200135
出 处:《建筑技术》2021年第2期145-150,共6页Architecture Technology
摘 要:目前国内在施项目多应用Microsoft excel、Project或梦龙等管理软件进行计划编制与跟踪管理,某大型文化旅游项目建设中应用P6软件,该软件以计划编制→跟踪→更新→反馈→调整为主线,从时间、资源、费用等多个管理维度,针对大型综合项目呈现出一套综合性管理方案,提高了项目管理水平,取得了良好效果。At present,management software such as Microsoft excel,Project or Menglong is mostly used in domestic projects for planning and tracking management.P6 software is used in the construction of a large-scale cultural tourism project.The software is based on planning→tracking→upd ate→fbedback→adjustment.From multiple management dimensions such as time,resources,cost,etc.,a comprehensive management plan was presented for large-scale comprehensive projects,which improved the project management level and achieved good results.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33