检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐亮 XU Liang(Yungang Mine of Datong Coal Mine Group,Datong037017,China)
出 处:《煤矿现代化》2021年第2期4-5,8,共3页Coal Mine Modernization
摘 要:为了减小切巷施工作业对巷道顶板产生的影响,保证扩帮期间顶板的稳定性,以云冈矿12-2#层410盘区81001巷采空区下切巷扩帮为研究对象,对比小循环扩帮、注浆加固、机掘正巷及扩帮三种施工技术,确定采用机掘正巷及扩帮技术,同时采用多种联合支护方式,提高顶板的稳定性,最后进行现场施工验证。结果表明:机掘正巷及扩帮技术提高了顶板的稳定性,解决了切巷扩帮中支架难以安装的难题,为极近距离煤层采空区掘进切巷扩帮提供了参考。In order to reduce the impact of roadway cutting operations on the roof of the roadway and ensure the stability of the roof during the expansion period,the lower cutting roadway expansion in the goaf area of No.81001 in the 410 panel of the Yungang mine 12-2#layer is taken as the research object.Comparing the three construction techniques of small-circulation expansion,grouting reinforcement,machine-drilling roadway and side-expanding,it is determined that the machine-driving roadway and side-expanding technology shall be adopted.At the same time,a variety of combined support methods are used to improve the stability of the roof.On-site construction verification showed that the machine-drilled main roadway and the expansion technology improved the stability of the roof,solved the difficult installation problem of the support in the cut roadway expansion,and provided a way for the excavation of the cut roadway expansion in the very short distance coal seam goaf.reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15