东曲矿充填开采工艺技术研究  

Research on filling mining technology in Dongqu mine

在线阅读下载全文

作  者:曹冬冬 CAO Dongdong(The Work Safety Supervision Bureau of Xishan Coal and Electricity(Group)Co.,Ltd.,Taiyuan 030053,China)

机构地区:[1]西山煤电(集团)有限责任公司安监局,山西太原030053

出  处:《煤矿现代化》2021年第2期9-11,14,共4页Coal Mine Modernization

摘  要:本文以东曲矿八采区8#煤层充填开采为实际工程背景,首先分析了该矿目前矸石排放及治理情况,并提出地面、井下矸石运输系统方案,进而对八采区首充28802工作面的充填工艺方案进行设计,通过应用充填开采技术可以达到较好的经济技术效果,并取得良好的社会效益。In this paper,the filling mining of No.8 coal seam in No.8 mining area of Dongqu coal mine is taken as the actual engineering background.Firstly,the current gangue discharge and treatment situation of the mine are analyzed,and the surface and underground gangue transportation system schemes are proposed.Then,the filling process scheme of the first filling 28802 working face in the eighth mining area is designed.Through the application of filling mining technology,better economic and technical effects can be achieved and good social effects can be achieved benefit.

关 键 词:煤矿 充填开采 矸石运输 充填工艺 

分 类 号:TD823.7[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象