检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯鲁顺 FENG Lushun(Dongtan Coal Mine,Yanzhou Coal Industry Company Limied,Zoucheng273500,China)
机构地区:[1]兖州煤业股份有限公司东滩煤矿,山东邹城273500
出 处:《煤矿现代化》2021年第2期77-79,82,共4页Coal Mine Modernization
摘 要:为做好东滩煤矿下步五七采区复杂地质构造中水害防治,通过五七采区相关资料系统收集、整理与分析,采用理论分析、现场实测和数值模拟等综合方法对采区内开采底板水害问题进行系统研究,研究成果不但可以充分回收煤炭资源、延长矿井稳产年限;同时,也为其它矿井断裂构造和风氧化带相关研究提供技术借鉴。In order to prevent and control the water hazards in the complex geological structure of the Wuqi mining area of Dongtan Coal Mine,the relevant data system of Wuqi mining area is collected,sorted and analyzed,and the comprehensive analysis of the mining area is carried out using theoretical analysis,on-site measurement and numerical simulation.Carrying out systematic research on the problem of floor water damage can not only fully recover coal resources and extend the stable production life of the mine;at the same time,it also provides technical reference for related research on other mine fault structures and wind oxidation zones.
分 类 号:TD743[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249