检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:施得兵 李宁[2] 焦婷丽 SHI Debing;LI Ning;JIAO Tingli(Hubei Institute of Water Resources Survey and Design,Wuhan 430070,China;Wuhan University,Wuhan 430072,China)
机构地区:[1]湖北省水利水电规划勘测设计院,湖北武汉430000 [2]武汉大学,湖北武汉430072
出 处:《水电与新能源》2021年第2期15-16,71,共3页Hydropower and New Energy
摘 要:物理模型试验是水利枢纽设计阶段保证设计合理性的主要措施之一。为了研究碾盘山水利枢纽水工建筑物布置的合理性,委托科研单位开展了整体水工模型、断面水工模型试验研究。论文比对了两个模型试验泄水建筑物泄流能力的研究成果,发现泄流能力复核结论总体一致、但存在一定的趋势差异。Physical model test is one of the main measures in the design stage of water conservancy projects to ensure the rationality of the design.Hydraulic model tests,including the whole model and section model,are carried out to study the hydraulic structure arrangement in Nianpanshan Water Conservancy Project.Specifically,the discharge capacities of the sluice gates are studied with these two models.It is found that the discharge capacities obtained from the two models are generally consistent with certain trend differences.
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7