检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭杰华 GUO Jiehua(Liyuan Power Generation Branch,Yunnan Huadian Jinsha River Middle Reaches Hydropower Development Co.,Ltd.,Lijiang Yunnan 674100)
机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674100
出 处:《中国科技纵横》2020年第16期83-84,共2页China Science & Technology Overview
摘 要:随着科技水平的不断提高,人类在电力能源上的需求也在不断增加。大型水电站运行中,会出现电气设备老化、设备缺陷、技术落后等问题,导致设备运行效率大大降低,应进行技术改造,确保生产效率及运行安全。With the continuous improvement of the level of science and technology,the human demand for power energy is also increasing.In the operation of large hydropower stations,problems such as aging of electrical equipment,defects of equipment and backward technology will occur,which greatly reduce the operating efficiency of equipment.Therefore,technical renovation should be carried out to ensure production efficiency and operation safety.
分 类 号:TV738[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12