检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许若男 XU Ruo-nan(Sinohydro Bureau 8 Co.,Ltd.,Changsha 410001,China)
机构地区:[1]中国水利水电第八工程局有限公司,长沙410001
出 处:《价值工程》2021年第2期97-99,共3页Value Engineering
摘 要:随着我国经济的快速发展和“走出去”、“一带一路”倡议的实施,越来越多的企业在政府的带动下开始进军国际市场,但是国际工程往往施工周期长、金额较大、技术复杂、政府干预较多、不确定性因素多,风险与机遇并存,针对2020年全球新冠病毒蔓延这一特殊的时期,企业更应在投标阶段做好风险分析、测算、管控工作,合理规避风险,总结经验教训,保证企业履约能力和竞争性。With the rapid development of China's economy and the implementation of the"Going Global"and"One Belt One Road"strategies,more and more companies have begun to enter the international market under the lead of the government,but international projects often have long construction periods and involve large amounts of money,complex technology,more government intervention,many uncertain factors,so risks and opportunities coexist.In the special period of the global epidemic spread in 2020,companies should do a good job in risk analysis,calculation,and control during the bidding stage,avoid risks,sum up experience and lessons,and ensure the ability to perform contracts and competitiveness.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112