检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭向荣 Tan Xiangrong(Hunan High Speed Railway Vocational and Technical College,Hengyang,Hunan 421002)
机构地区:[1]湖南高速铁路职业技术学院,湖南衡阳421002
出 处:《江西建材》2021年第2期165-165,167,共2页Jiangxi Building Materials
摘 要:乐昌东站站房及客运设施工程由于紧邻武广高铁,为保证高铁运营的安全,就必须对既有线进行监测,确保既有线路结构稳定。因此在监测点的设计上面,必须按有关变形控制要求实施,科学的分析和研究施工监测方法,通过监测结果分析显示施工过程中各方的沉降量和位移量都在控制范围内,这样就可以确保施工过程中线路运营安全及施工人员的人身安全。Because Lechang east station building and passenger transport facilities project is close to Wuhan Guangzhou high speed railway, deformation monitoring is particularly important at this time, because the disturbance during construction will have certain impact on the existing high-speed railway. it is necessary to monitor the existing line to ensure the structural stability of the existing line. Scientific analysis and Research on construction monitoring methods show that the settlement and displacement of all parties in the construction process are within the control range through the analysis of monitoring results, This can ensure the line operation safety and the personal safety of construction personnel in the construction process.
分 类 号:TU712.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7