城市轨道交通信号系统大修改造方案分析  被引量:9

Analysis of Renovation Solution to Overhaul of Signaling System in Urban Mass Transit

在线阅读下载全文

作  者:张惺[1] Zhang Xing

机构地区:[1]中铁二院工程集团有限责任公司地下铁道设计研究院,成都610031

出  处:《铁道通信信号》2021年第1期88-90,94,共4页Railway Signalling & Communication

摘  要:根据城市轨道交通信号系统改造的设计原则,提出"维持既有系统制式"和"完全新建系统"2种不同的信号系统改造方案.从工程投资、工程实施,以及改造后的系统性能和运营需求等方面对2种方案进行了详细对比分析,可为信号系统的大修改造提供参考.Based on the design principle of renovating the signaling system in urban rail transit,two technical solutions for renovating the signaling system are presented:one solution to maintaining the mode of the existing system and the other solution to building a completely new system.Detailed comparison of the two technical solutions are made in considerations of project investment and project implementation as well as the performance and operational requirements of the signaling system after renovation,which can offer references for the overhaul or renovation project of the signaling system in urban rail transit.

关 键 词:城市轨道交通 信号系统 大修 改造方案 

分 类 号:U284.92[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象