检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡冰 Hu Bing(Shanxi Fenxi Zhengcheng Coal Industry Co.,Ltd.,Xiaoyi Shanxi 032300)
机构地区:[1]山西汾西正城煤业有限责任公司,山西孝义032300
出 处:《机械管理开发》2021年第2期158-159,213,共3页Mechanical Management and Development
摘 要:以某矿+750 m水平运输大巷围岩控制为工程背景,对引起巷道围岩变形的原因、机理进行分析,针对围岩变形特点,提出以锚索补强+注浆为主的巷道修整技术方案,并详细对修整技术方案以及应用效果进行阐述。现场应用后,围岩变形量得到明显控制,围岩变形不会给巷道后续运输、通风造成不利影响,取得了显著的修整效果。Taking the surrounding rock control of 750 m horizontal transport roadway as the engineering background,this paper analyzes the causes and mechanisms of surrounding rock deformation, and puts forward the technical scheme of roadway dressing based on anchor cable reinforcement grouting according to the characteristics of surrounding rock deformation, and expounds the technical scheme and application effect of dressing in detail. After the field application, the deformation of surrounding rock can be obviously controlled, and the deformation of surrounding rock will not cause adverse effects on the subsequent transportation and ventilation of roadway, and obtain remarkable repair effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7