基于完整性管理的集输埋地管道风险评估  被引量:7

Risk assessment of buried hydrocarbon gathering pipeline based on integrity management

在线阅读下载全文

作  者:李玉阁[1,2] 陈晓林 宋文明 李金瑞[1,4] 林海萍 何等江[1,2] LI Yuge;CHEN Xiaolin;SONG Wenming;LI Jinrui;LIN Haiping;HE Dengjiang(Lanpec Technologies Limited,Lanzhou,Gansu,730070,China;Machinery Industry Shanghai Lanya Petrochemical Equipment Inspection Institute Co.,Ltd.,Shanghai,201518,China;Yueyang Jianhua Engineering Co.,Ltd.,Yueyang,Hunan,414000,China;Shanghai Lanbin Petrochemical Equipment Co.,Ltd.,Shanghai,201518,China)

机构地区:[1]甘肃蓝科石化高新装备股份有限公司,甘肃兰州730070 [2]机械工业上海蓝亚石化设备检测所有限公司,上海201518 [3]岳阳建华工程有限公司,湖南岳阳414000 [4]上海蓝滨石化设备有限责任公司,上海201518

出  处:《天然气与石油》2021年第1期134-139,共6页Natural Gas and Oil

基  金:上海市服务业发展引导资金项目“油气输送埋地管线检测服务能力提升项目”(20JCJ004);中国石油化工股份有限公司“高含硫气田平台期开发生产安全保障技术及工业化应用”项目子课题“高含硫天然气集输与净化装置腐蚀风险防控及安全运行关键技术研究”(319022-12)。

摘  要:为了解决依靠经验和领导决策等传统应急抢险管理模式对潜在风险缺乏预见性和针对性的问题,改善集输管道完整性管理应用效果不佳的状况,分析了集输管道完整性管理在管道风险评估理念、管道管理数据库维护、管道风险评估分段、风险分析损伤模式、后果计算评估软件、高风险点未实现精准定位管理中存在的问题,提出了基于完整性管理的风险评估理念。通过明确埋地管道区段的划分原则、埋地管道失效可能性评价原则、埋地管道失效后果评价原则,提出了风险点管道三维走向和现场定位方案,建立了基于完整性管理的集输埋地管道风险评估规范,有利于开展进一步的完整性管理评价、日常巡查、检维修等风险管理工作,提高了风险管理的操作性和有效性,为管道完整性管理的有效开展提供了指导。Since the traditional emergency response management model relies on past experience and leadership decision-making,it lacks foresight and focus on potential risks.In order to improve the poor performance of gas gathering pipeline integrity management,this paper analyzes the issues of gas gathering pipeline integrity management in pipeline risk assessment concept,pipeline management database maintenance,pipeline risk assessment segmentation,risk analysis of mode of damage,consequence calculation and risk assessment modelling software,and failure to achieve precise positioning and management of high risk points,and proposes the risk assessment concept based on integrity management.By defining the principle of dividing buried pipeline sections,the principle of evaluation of buried pipeline failure possibility and the principle of evaluation of buried pipeline failure consequence,the threedimensional trending of buried pipeline risk and site positioning scheme of pipelines at risk points are proposed.With this proposal,the risk evaluation specification for buried pipeline based on integrity management is established,which promotes integrity management evaluation,daily inspection and maintenance.As a result,the operability and effectiveness of risk management have also been improved,providing guidance for effective implementation of pipeline integrity management.

关 键 词:完整性管理 风险评估 埋地管道 集输系统 腐蚀 安全 

分 类 号:TE88[石油与天然气工程—油气储运工程]

 