检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李胜林[1] 王宗睿 孙建成 王永超 LI Sheng-lin;WANG Zong-rui;SUN Jian-cheng;WANG Yong-chao(School of Mechanics and Civil Engineering,China University of Mining and Technology,Beijing 100083,China;Huai′an Qingjiangpu District Fixed Assets Investment Audit Center,Huai′an 223001,China;Beijing Jinyu Beishui Environmental Protection Technology Co.,Ltd.,Beijing 102202,China)
机构地区:[1]中国矿业大学(北京)力学与建筑工程学院,北京100083 [2]淮安市清江浦区固定资产投资审计中心,淮安223001 [3]北京金隅北水环保科技有限公司,北京102202
出 处:《爆破》2021年第1期70-74,共5页Blasting
基 金:国家自然科学基金(51574247、10272109);教育部高等学校博士学科点专项科研基金(006029009);中央高校基本科研业务专项资金(2010QL05)。
摘 要:在露天矿爆破工程中,爆破延时对爆堆形态有着重要的影响。研究爆堆形态特征随爆破延时的变化规律,可以优化爆破设计方案,便于铲装、运输及破碎等后序工序的进行,提高矿山生产效益。矿山生产中爆堆形态主要通过爆堆的高度、外形特征等方面进行评价。通过分析爆堆形态是否符合铲装设备生产要求可评价爆破效果的理想性。选取某露天矿山台阶爆破工程为背景,运用无人机倾斜摄影测量技术获取矿山爆堆倾斜影像数据,使用Smart 3D进行三维爆堆模型构建,提取爆堆模型轮廓曲线,研究逐孔起爆时不同延时下爆堆形态特征,孔间延时23 ms、排间延时50 ms下爆堆评价指标总体优于其他组别,更适用于该矿山爆破生产。通过Matlab软件选用Weibull函数进行爆堆形态拟合,得到Weibull函数参数α取值范围为1.0297~1.2194,β取值范围为1.1754~1.8040。In open-pit mine blasting,blasting delay time has an important influence on the shape of the blasting pile.The study on the variation law of blasting pile shape characteristics with changing delay time can optimize the blasting design scheme,facilitate the subsequent procedures such as shovel loading,transportation and crushing,and improve the mine production efficiency.The shape of the blasting pile in mine production is mainly evaluated by the height and shape characteristics of the blasting pile.The ideality of the blasting effect can be evaluated by analyzing whether the shape of the blasting pile meets the production requirements of shovel loading equipment.Taking a bench blasting project of an open-pit mine,the UAV tilt photogrammetry technology was used to obtain mine blasting pile tilt image data,and built a blasting pile model with smart 3D.The contour curve of blasting pile model was extracted,and the shape characteristics of blasting pile under different delay time were studied.The evaluation index of blasting pile under the delay time with 23 ms between holes and 50 ms delay between rows was better than those of other groups,which was more suitable for blasting production in the mine.Through MATLAB software,the Weibull function was selected to fit the shape of the explosive heap,and the value range of parameterαof Weibull function was 1.0297~1.2194,and the value range ofβwas 1.1754~1.8040.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249