检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵真真 李学德 李晖 聂振[1] 瞿志斌[1] SHAO Zhen-zhen;LI Xue-de;LI Hui;NIE Zhen;QU Zhi-bin(Jiangsu Surveying and Design Institute of Water Resources Co.,Ltd.,Yangzhou 225127,China)
机构地区:[1]江苏省水利勘测设计研究院有限公司,扬州225127
出 处:《价值工程》2021年第4期56-57,共2页Value Engineering
摘 要:在水利工程建设中,不可避免的会遇到移民搬迁问题,搬迁移民能否安置好不仅影响到搬迁移民的切身利益,也影响到工程能否顺利进行。本文将以里下河川东港工程搬迁安置规划为例,从工程影响实物量、规划搬迁安置人口、搬迁安置方案、补偿标准等角度探讨在移民搬迁安置规划中的主要工作要点。In the construction of the water conservancy project,there will inevitably be problems of migrant relocation and settlement,whether the relocated people can be resettled well not only affects the immediate interests of the relocated people,but also affects whether the project can be carried out smoothly.This article will take the migrant relocation and settlement planning of Chuandonggang of Lixia River Project relocation as an example,this paper probes into the main points of work in the resettlement planning from the aspects of the physical quantity affected by the project,the planning of the relocation and resettlement population,the relocation and resettlement program,and the compensation standard.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3