检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱玉芳[1] 高金彬 万众[1] 贺泳 郭开忠 左引萍 黄轶昕[3] ZHU Yu-Fang;GAO Jin-Bin;WAN Zhong;HE Yong;GUO Kai-Zhong;ZUO Yin-Ping;HUANG Yi-Xin(Gaoyou Center for Disease Control and Prevention,Jiangsu Province,Gaoyou 225600,China;Yangzhou Municipal Center for Disease Control and Prevention,Jiangsu Province,China;Key Laboratory of National Health Commission on Parasitic Disease Control and Prevention,Jiangsu Provincial Key Laboratory on Parasite and Vector Control Technology,Jiangsu Institute of Parasitic Diseases,China)
机构地区:[1]江苏省高邮市疾病预防控制中心,高邮225600 [2]江苏省扬州市疾病预防控制中心 [3]国家卫生健康委员会寄生虫病预防与控制技术重点实验室、江苏省寄生虫与媒介控制技术重点实验室、江苏省血吸虫病防治研究所
出 处:《中国血吸虫病防治杂志》2021年第1期79-80,83,共3页Chinese Journal of Schistosomiasis Control
基 金:江苏省科技支撑(社会发展)项目(BE2008632);国务院南水北调工程建设委员会办公室资助项目(2014-06);江苏省扬州市科技重大科技示范项目(YZ2017064)。
摘 要:目的了解南水北调东线工程通水运行后里运河高邮段钉螺分布及水位变化。方法2014—2019年,采用系统抽样结合环境抽查法和打捞水体漂浮物观察法,分别对里运河高邮段河岸和水体进行钉螺监测;收集、分析南水北调东线工程运行前典型水文年份以及2016—2019年里运河高邮段水位变化情况。结果2014—2019年,里运河高邮段累计开展钉螺调查235.42 hm^(2)、打捞漂浮物75.8 kg,均未发现钉螺。南水北调东线工程运行前,里运河高邮段水位多为汛期较高、枯水期较低,运行后呈枯水期水位抬高、汛期相对较低的状态。结论南水北调东线工程运行后,里运河高邮段改变了河岸环境原有的"冬陆夏水"状态,因此不利于钉螺孳生。Objective To understand the distribution of Oucomelania hupensis snails and changes of water levels in Gaoyou sections of the Li Canal following the operation of the eastern route project of the South-to-North Water Diversion Project.Methods The Oncomelania snails were monitored in the river banks and water bodies of Gaoyou sections of the Li Canal by means of systematic sampling combined with environmental sampling as well as collection of the floaters from 2014 to 2019,and the water levels"were collected in Gaoyou sections of the Li Canal at the typical hydrological year before the operation of the eastern route project of the South-to-North Water Diversion Project and during the period between 2016 and 2019.Results A total area of 235.42 hm^(2)were investigated and a total of 75.8 kg floaters were collected in Gaoyou sections of the Li Canal from 2014 to 2019;however,no snails were found.The water level in Gaoyou sections of the Li Canal was predominantly high in the flood season and low in the dry season before the operation of the eastern route project of the South-to-North Water Diversion Project,and the water level was elevated in the dry season and relatively low in the flood season after the operation of the project.Conclusion Following the operation of the eastern route project of the South-to-North Water Diversion Project,the original river bank that is characterized by"land in winter and water in summer"has changed in Gaoyou sections of the Li Canal,which is not favorable for snail breeding.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28