检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李经纬 史云龙 许光伟 LI Jing-wei;SHI Yun-long;XU Guang-wei(CNOOC(China)Ltd.,Tianjin Branch,Tianjin 300450,China)
机构地区:[1]中海石油(中国)有限公司天津分公司,天津300450
出 处:《化工管理》2021年第9期133-134,共2页Chemical Engineering Management
摘 要:随着海上油气田开发范围愈发广阔,中心平台注水量不断增加,大功率注水泵成为当前海洋石油开发广为需要的设备。文章以某海上油田项目为例,通过对注水泵泵型和结构进行有效确定,然后对注水泵设计的关键技术进行详细的分析,并对其具体的应用进行相应的探讨,期望能够不断地提升海上油气田项目开发效率,有效推进国产化注水泵的使用,降低海上开发成本,切实实现海上油气田开发降本增效。With the development of offshore oil and gas f ields more and more extensive,the water injection capacity of central platform is increasing,and high-power water injection pump has become the key equipment for offshore oil development.Taking an offshore oil f ield project as an example,this paper effectively determines the type and structure of the water injection pump,then analyzes in detail the key technologies in the design of the water injection pump,and probes into its specif ic application,it is expected to continuously improve the development eff iciency of offshore oil and gas f ield projects,effectively promote the use of domestic water injection pumps,reduce the cost of offshore development,and realize cost reduction and eff iciency increase in offshore oil and gas f ield development.
分 类 号:TE54[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.253.134