检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:颜长青 布臣 严柳 陈伶翔 YAN Changqing;BU Chen;YAN Liu;CHEN Lingxiang
机构地区:[1]招商局重工(江苏)有限公司,江苏南通226100
出 处:《中国修船》2021年第2期42-45,共4页China Shiprepair
基 金:2017年工信部高技术船舶科研项目——“半潜式起重拆解平台开发”(MC-201710-H01)。
摘 要:文章以半潜式起重拆解平台重吊作业为研究对象,对吊机作业过程中可能涉及的典型工况进行计算分析,包括单台吊机起吊及卸载工况,单台吊机带载旋转工况,两台吊机联合起吊及卸载工况。通过对吊机不同作业工况的分析,确保平台配备的压载系统、压载舱的布置可以满足重吊作业需求。Taking the heavy lifting operation of the semi-submersible lifting and dismantling platform as the research object,this paper calculates and analyzes the typical working conditions that may be involved in the operation of the crane,including the lifting and unloading conditions of a single crane,the rotating conditions of a single crane with load.Joint lifting and unloading conditions of two cranes.Through the analysis of different working conditions of the crane,it is ensured that the ballast system and ballast tank arrangement of the platform can meet the requirements of heavy lifting operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229