综采工作面悬挂式电气列车前移过弯道研究  

Study on Suspended Electric Train Moving forward through Curve in Fully Mechanized Mining Face

在线阅读下载全文

作  者:王鹏 李文华 WANG Peng;LI Wenhua(Gaohe Energy Co.,Ltd.,Lu'an Chemical Group of Shanxi,Changzhi 047100,Shanxi,China)

机构地区:[1]山西潞安化工集团高河能源有限公司,山西长治047100

出  处:《能源与节能》2021年第3期165-167,共3页Energy and Energy Conservation

摘  要:以高河能源有限公司W1320综采工作面悬挂式电气列车前移过弯道工程实践为例,通过详细分析巷道布置特征和悬挂式电气列车整体布局,对悬挂式电气列车前移过弯道方案及关键技术进行了探讨,为类似巷道布局的工作面前移电气列车提供了借鉴。Taking the practice of the suspended electric train moving forward through the curve in W1320 fully mechanized min-ing face of Gaohe Energy Co.,Ltd.as an example,through a detailed analysis of the roadway layout characteristics and the overall layout of the suspended electric train,this paper discussed the plan and the key technologies for the suspended electric train moving forward through the curve,which provided reference for the electric train moving forward in the working face with similar roadway layout.

关 键 词:综采工作面 悬挂式电气列车 过弯道 回撤 

分 类 号:TD524[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象